Skip to content

Plan your release backwards from release day

A release goes well when the work is finished in the right order: the master before the delivery, the video before the teasers, the pitch before Spotify's cut-off. Enter your release day and the planner dates every step for you, from six weeks out to two weeks after, and puts it in your calendar with one download.

Free, no sign-up. Runs in your browser: nothing is uploaded.

Release

Music video

Pick your release day to see the plan.

Song finished? Upload it and Muvora plans the whole video on its beats. The storyboard is free.

Make the videoUpload a new song

How to use the release timeline planner

  1. 01

    Pick release day

    Choose the date the music comes out; the planner suggests six weeks from today.

  2. 02

    Say what you're releasing

    A single, an EP or an album, and whether the music video still needs making.

  3. 03

    Read the plan

    Every step gets a date, a reason and a link to the guide or tool that helps with it.

  4. 04

    Save it

    Download it as a calendar file for Google Calendar, Apple Calendar or Outlook, or copy it as a checklist.

Dated backwards from the one date that can't move

Release day is fixed once it is set with your distributor, so the plan counts back from it: when to lock the master, when to deliver, when the video needs rendering so the teasers exist, and the last day a Spotify pitch still reaches your followers' Release Radar.

  • Six weeks of lead time for a single
  • Earlier focus-track planning for an EP or album
  • Spotify's 7-day pitch rule built in

The visuals are part of the plan

Most release plans stop at the audio. This one schedules the music video, the vertical cuts of the hook, the Canvas loop, the YouTube upload and a clip schedule for the two weeks after, because that is when a song is easiest to discover.

  • Storyboard and render dates for the video
  • Teasers before release day
  • A clip plan for the weeks after

In your calendar in one click

The calendar file holds one all-day event for every step, each with its details and the link that helps, and works in any calendar app. Nothing is uploaded: the plan is made in your browser.

  • One event per step
  • Works with Google, Apple and Outlook calendars
  • Or copy it as a checklist
Two phones on a cobalt background: one plays a neon ring of light as a looping Canvas, the other paper boats glowing on a frozen river as a vertical short.
Storyboard frames from “Pressure Front” and “Paper Boats” cropped to 9:16 and shown on phones

Get the video steps done this week

The longest lead time in the plan is usually the music video. Upload the song and Muvora writes the storyboard on the beat for free; render it when it's right, and the vertical cut and the Canvas come from the same render, ready for every date in the plan.

Questions, answered

Can't find what you need? Start a free storyboard and see for yourself.

How far ahead should I plan a single release?

Six weeks is a comfortable runway for an independent single: time to deliver, pitch and make the visuals without rushing. Start two to four weeks earlier for an EP or album.

When should I pitch my song to Spotify?

As soon as the song appears under upcoming releases in Spotify for Artists. Spotify's help says a pitch made at least 7 days before release reaches your followers' Release Radar; earlier gives editors more time.

When should the music video come out?

Most artists premiere the video on release day or within the first week, with teaser clips from it in the two weeks before.

Does the calendar file work with Google Calendar?

Yes. It is a standard iCalendar file with all-day events, which Google Calendar, Apple Calendar and Outlook all import.

More free tools: release and promotion

Pitch the song, write the press release, build the press kit, plan release week, write the YouTube description and estimate what streams pay.

Your song deserves a music video

Upload a track and get a free beat-synced storyboard in minutes. Render it when you are ready.

No card needed to start.